home | work platform | equipment | contact us | all information and photos property of HD Energy Rentals Ltd. |
780.831.0040, Grande Prairie • 780.223.0040, Hinton | R.R. 3, Site 1, Box 42, Grande Prairie, AB T8V 5N3
Attach crane to top of telescoping stairs. Pull spring pin. Hoist
into position. (Watch for pinch points, stairs will scope out as
required)
Ensure stairs are fully
hooked in pockets and
sitting level.
Your platform is now
complete.
Install handrails in marked
positions
Work Platform Rig Out Instructions
• Ensure no equipment is on work floor and centre pad is pinned to keep from sliding.
• Remove handrails and put away on racks. Install pins to hold hand rails on racks.
• Attach crane to stairs and lower to base. (Watch for pinch points). NOTE: It is not
necessary to remove handrails
• Attach crane to front of work floor and hoist to vertical position.
• Remove positioning pins and adjust work floor to travel position ( 4 adjustment holes from bottom)
• Install positioning pins and binding pins.
• Hold up on work floor and remove keeper pins. Lay down rails and platform.
•Ensure rails are set in racks.