Safe Work Platform PDF

 

Please download a copy of theinstruction sheet and keep with you at the lease.

 

pdf instrutions

 

Equipment Dispatch Login

Enter password:

The Safe Work Platform

The Work Platform will arrive onsite with all the necessary equipment needed for set up.

  • Engineered For Safety
  • Simple set up
  • Affordable
  • Single and double floors

 

Set up Instructions

1: Platform Arrives Onsite

 

The Work Platform will arrive onsite with all the necessary equipment needed for set up.

 

work platform
2: Spotting

 

Spot matting square and centered 18” to 24” from casing bowl. Level as required.

 

3: Installing Pins

Positioning, binding and leg pins must be installed.

 

4: Positioning Floor

 

1) Attach crane to floor sling provided. Lift on front of platform to stand floor and rails vertical

2) Lifting point will swing as platform hinges to vertical position. (Watch for pinch points).

3) Install Keeper pins to hold assembly vertical.

 

5: Positioning Floor Continued

 

With crane holding up floor, remove binding and positioning pins. Position work floor to required height and install positioning pins.

Lower work floor to horizontal position.(Watch for swinging floor legs).Adjust floor legs to level floor and install Keeper pins. Set down floor legs on solid base.

Note: Leg cross braces are required every 2.5 m (8ft) above the ground.

 

6: Attach Stairs

 

Attach crane to top of telescoping stairs. Pull spring pin. Hoist into position. (Watch for pinch points, stairs will scope out as required).Ensure stairs are fully hooked in pockets and sitting level.

 

7: Install Handrails

 

Install handrails in marked positions and your platform is finished!

 

Work Platform Rig Out Instructions

 

• Ensure no equipment is on work floor and centre pad is pinned to keep from sliding.
• Remove handrails and put away on racks. Install pins to hold hand rails on racks.
• Attach crane to stairs and lower to base. (Watch for pinch points). NOTE: It is not necessary to remove handrails
• Attach crane to front of work floor and hoist to vertical position.
• Remove positioning pins and adjust work floor to travel position ( 4 adjustment holes from bottom)
• Install positioning pins and binding pins.
• Hold up on work floor and remove keeper pins. Lay down rails and platform.
•Ensure rails are set in racks.

 

Having trouble with the assemby? Watch the movie or download the PDF instruction sheet, still have questions call us at 780-831-0040. We will be glad to help.